BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

Project Status: Concluded

Program

Border 2012 Program

Goal

#3: Reduce Land Contamination

Grant Funds

$74,953.00 USD

Sponsor

TRANSPORTES RAFA DE BAJA CALIFORNIA, S.A. DE C.V.

ID#

20001

Because of the threats associated with tire piles, the project proposes to remove 300,000 scraptires in the EL Centinela site, nearby Mexicali, B.C.

    Final Report Document