This project was Certified on March 24, 2000

Sector

Water / Wastewater

Location

Cd. Acuna, Coahuila, MEX

Benefited Population

133,194 people

Projected Cost

$78,800,000.00 USD

Technical Assistance

$258,346.00USD from PDAP

Sponsor

Comisión Estatal de Agua y Saneamiento de Saltillo

ID#

6

The project consists of improving sewerage services to Cd. Acuña, including the construction of a wastewater treatment plant (WWTP), with a capacity of 5.71 million gallons per day (mgd) per second, to reach about 75% coverage. The new WWTP will replace an old oxidation lagoon system that was originally designed in the 1960's.