The project consists of improving sewerage services to Cd. Acuña, including the construction of a wastewater treatment plant (WWTP), with a capacity of 5.71 million gallons per day (mgd) per second, to reach about 75% coverage. The new WWTP will replace an old oxidation lagoon system that was originally designed in the 1960's.