BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on June 24, 1998

Sector

Water / Wastewater

Location

Donna, Texas, USA

Benefited Population

19,000 people

Projected Cost

$21,620,000.00 USD

Sponsor

City of Donna

ID#

117

The water projects are proposed for completion in two phases. The Phase I water projects consist of the following: Construction of a 4.5 mgd water treatment plant on a new site and abandon existing water plant., construction of an elevated storage tank with a minimum capacity of 200,000 gallons, expansion of the water distribution system to serve surrounding colonias, tie the new water treatment plant into the distribution system, and improve water pressure in the service area. The Phase II water projects consist of the following: Replacement of existing deteriorated and inadequate water piping. This will also require some wastewater line relocation to achieve adequate water and sewer separation distances.

    Certification Document