Construction of a wastewater collection system and decommissioning of the existing on- site septic systems, which includes approximately 43,705 linear feet of PVC pipe ranging from 8-16 inches, 145 manholes, one lift station and 2,189 linear feet of 6 inch PVC force main.
Close Out Report
Close Out Report
The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.