BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on December 05, 1997

Sector

Water / Wastewater

Location

El Paso, Texas, USA

Benefited Population

700,000 people

Projected Cost

$37,820,000.00 USD

Technical Assistance

$628,549.00USD from PDAP

Sponsor

El Paso Water Utilities

ID#

112

The project will increase the potable water supply available for residents of the city of El Paso and colonia residents in the surrounding areas within El Paso County.

    Certification Document

Close Out Report

Close Out Report

The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.

    Close Out Report   (PDF, 357 KB)