The project consists of the construction of a wastewater collection system (WWCS) for the areas Lomas del Valle, Maclovio Rojas and Ojo de Agua in the municipality of Tijuana, Baja California. The project includes the construction of approximately 94,737 linear meters (310,816 linear ft) of wastewater collection pipelines made of PVC material ranging from 20 to 76 cm (8 to 30 inches) in diameter. All wastewater collected by the new WWCS (approximately 69 lps) will be treated at La Morita wastewater treatment plant(WWTP).
Close Out Report
Close Out Report
The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.
Close Out Report