BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on May 20, 2011

Sector

Water / Wastewater

Location

Tijuana, Baja California, MEX

Benefited Population

3,020 people

Projected Cost

$1,110,000.00 USD

Technical Assistance

$15,490.00USD from PDAP

Sponsor

Comisión Estatal de Servicios Públicos de Tijuana

ID#

589

The project consist of the construction of wastewater collection infrastructure for the unserved area Los Alcatraces, in Tijuana, BC. Installation of sewer lines with approximately 8,648 meters (28,373 ft)of 8 inches diameter PVC pipelines. Installation of wastewater sub=collectors with approximately 1,470 meters (4,823 ft) of PVC and Polyethylene pipelines in diameters of 8 to 10 inches. Wastewater generated in the project area (approximately 8.78 lps or 0.2 MGD) will be treated at the Rosarito Norte wastewater treatment plant which has adequate treatment capacity. Treated effluent will be discharged into the Pacific Ocean via the Reforma creek.

    Certification Document