The project consists of the construction of wastewater collection infrastructure in the unserved area Ejido Plan Libertador and Ampliacion, the project includes the installation of approximately 3,504 connections, as well as the construction of a collector to convey the wastewater generated in the project area to an existing WWTP. The projects does not requiere the rehabilitation of existing infraestructure or additional treatment capacity.