This project was Certified on July 21, 2009

Sector

Water / Wastewater

Location

Rosarito, Baja California, MEX

Benefited Population

6,806 people

Projected Cost

$1,500,000.00 USD

Technical Assistance

$10,593.00USD from PDAP

Sponsor

Comisión Estatal de Servicios Públicos de Tijuana

ID#

593

The project consist of the construction of wastewater collection infrastructure for the unserved area Colonia Aztlán, in Playas de Rosarito, BC. The project was certified jointly with the wastewater collection system for areas Aztlan, Independencia and Lomas de Rosarito, which have been selected for BEIF funding as the Rosarito 2 projects group.

    Certification Document

Close Out Report

Close Out Report

The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.

    Close Out Report