BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on July 16, 2008

Sector

Water / Wastewater

Location

Imperial, California, USA

Projected Cost

$2,520,000.00 USD

Sponsor

Imperial Irrigation District

ID#

549

The project will automate ten lateral headings and ten check structures located in the Vail Canal. The proposal includes automated flow measurement and control infrastructure. The project will reduce water losses due to innacurate gate and flow control. Water savings are estimated at 913 Acre-feet per year.

    Certification Document