BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on May 09, 2013

Sector

Clean and Efficient Energy

Location

Saltillo, Coahuila, MEX

Benefited Population

6,699 people

Projected Cost

$6,150,000.00 USD

Sponsor

Lorean Energy Group, SAPI de CV

ID#

789

The project consists of the design, construction and operation of a biogas facility to capture and use methane gas to generate up to 2.0 MW of energy, located at the landfill that serves Saltillo, Coahuila (the "Project"). The plant will supply electricity to the Municipality of Saltillo to be used for public lighting and for its general electricity consumption under a self-supply permit. The Project will increase the installed capacity for power generation based on renewable energy resources, reducing the demand on traditional fossil fuel‐based energy production and contributing to the displacement of greenhouse gas emissions and other pollutants produced by fossil fuel‐based processes.

    Certification Document