The proposed project is to implement priority improvements to the conveyance system of Valley Municipal Utility District No. 2 (VMUD No. 2) to reduce evaporation and seepage losses and operation and maintenance costs. The project includes the replacement of Main Canal with a pipeline from The Rio Grande to Resaca de Rancho Viejo.