BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on December 16, 2008

Sector

Water / Wastewater

Location

Los Fresnos, Texas, USA

Benefited Population

2,606 people

Projected Cost

$1,980,000.00 USD

Sponsor

Cameron County Irrigation District #6

ID#

541

The project proposed by the Cameron County Irrigation District No. 6 (CCID) includes improvements to the pumping system. The project entails the installation of two supplemental pumps and motors to be located at the river pumping plant. These pump and motor combinations will utilize vertical turbine technology with natural gas powered engines.

    Certification Document