This project was Certified on September 28, 2007

Sector

Water / Wastewater

Location

El Porvenir, Mpo. de Praxedis G. Guerrero, Chihuahua, MEX

Benefited Population

4,481 people

Projected Cost

$2,270,000.00 USD

Technical Assistance

$43,053.00USD from PDAP

Sponsor

Junta Rural de Agua y Saneamiento de Praxedis G Guerrero

ID#

509

The project consists of the expansion and rehabilitation of the wastewater collection system (WWCS) and the construction of a wastewater treatment plant (WWTP) based on oxidation lagoons for the community of El Porvenir, Municipality of Praxedis G. Guerrero, Chihuahua.

    Certification Document

Close Out Report

Close Out Report

The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.

    Close Out Report   (PDF, 180 KB)