BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on May 06, 2016

Sector

Water / Wastewater

Location

Reynosa, Tamaulipas, MEX

Benefited Population

266,853 people

Projected Cost

$15,658,700.00 USD

Sponsor

Comisión Municipal de Agua Potable y Alcantarillado de Reynosa

ID#

745

The proposed project consists of the expansion of the existing 5.7 million gallons per day (MGD) (250 liters per second (lps) Wastewater Treatment Plant No. 2 (WWTP-2) serving the south sector of Reynosa, Tamaulipas by building two new treatment modules with 5.7 MGD (250 lps) capacity each along with the construction of Lift Station No. 278 and the rehabilitation of Lift Station No. 1 in the north sector of Reynosa. The proposed wastewater infrastructure will be operated by the local water and wastewater utility –Comisión Municipal de Agua Potable y Alcantarillado de Reynosa (COMAPA).