The project submitted for certification is part of the Comprehensive Project to improve water, wastewater collection and treatment services in San Luis Rio Colorado. The project includes the expansion of the sewer collection system. The wastewater generated will be treated at the local wastewater treatment facility, which has sufficient treatment capacity. The system expansion includes six subcollectors ranging in size fron 8" to 30", sewer lines and residential sewer connections. The project will serve 13,120 service connections.
Close Out Report
Close Out Report
The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.
Close Out Report