BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on November 08, 2012

Sector

Water / Wastewater

Location

Bisbee, Arizona, USA

Benefited Population

112 people

Projected Cost

$1,460,000.00 USD

Technical Assistance

$154,824.00USD from PDAP

Sponsor

City of Bisbee

ID#

642

The project consists on the construction of a new wastewater collection infrastructure, lift station, force main and photovoltaic system component, to connect to an existing collector/interceptor line conveying wastewater flows to the San Jose Treatment facility owned by the City of Bisbee.

    Certification Document