This project was Certified on October 16, 2001

Sector

Water / Wastewater

Location

Tijuana, Baja California, MEX

Benefited Population

1,349,711 people

Projected Cost

$42,010,000.00 USD

Technical Assistance

$33,803.00USD from PDAP

Sponsor

Comisión Estatal de Servicios Públicos de Tijuana

ID#

251

The project consists of the rehabilitation of approximately 131,000 meters of wastewater collection lines, which represents approximately 7.5% of the total length of the city’s system.

    Certification Document

Close Out Report

Close Out Report

The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.

    Close Out Report