The project consists of the rehabilitation of approximately 131,000 meters of wastewater collection lines, which represents approximately 7.5% of the total length of the city’s system.
Close Out Report
Close Out Report
The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.