BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on March 26, 1999

Sector

Water / Wastewater

Location

Heber, California, USA

Benefited Population

3,400 people

Projected Cost

$3,380,000.00 USD

Technical Assistance

$179,148.00USD from PDAP

Sponsor

Heber Public Utility District

ID#

167

The proposed expansion will double the extended aeration treatment facility currently in place. The proposed technology (i.e. oxidation ditch) is well developed and suited for Heber. The scope of the project involves the construction of an oxidation ditch identical to that currently in operation at the plant. Additional work items include improvements to the headworks, additional pumping capacity, two new clarifiers, improved sludge drying, larger discharge lines and a disinfection system.

    Certification Document