BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on September 14, 2000

Sector

Water / Wastewater

Location

Somerton, Arizona, USA

Benefited Population

3,200 people

Projected Cost

$3,440,000.00 USD

Sponsor

City of Somerton

ID#

225

The project consists of the replacement of existing asbestos cement pipe (ACP) water mains, service lines, meter boxes, meters, and fire hydrants, and the installation of new system control valves.

    Certification Document