BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on April 30, 1996

Sector

Water / Wastewater

Location

Naco, Sonora, MEX

Benefited Population

6,000 people

Projected Cost

$2,070,000.00 USD

ID#

10

Upgrade the water treatment system to ensure a timely and permanent supply of drinking water for the population. Encourage water users to hook-up to the wastewater collection system so that it can operate efficiently and at the capacity for which it was originally designed. Expand the "Eastside" treatment pond module and operate it as one system, which will eliminate the need to use the existing lift station, which will provide additional infrastructure and allow for storage and control of the treated wastewater to be reused for crop irrigation. It will also eliminate overflows in the system and allow the City to comply with IBWC Minute N° 273. Promote the necessary institutional capacity building in order to guarantee an efficient level of management and operation of the system.

    Certification Document