BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on March 27, 2007

Sector

Water / Wastewater

Location

Lordsburg, New Mexico, USA

Benefited Population

3,379 people

Projected Cost

$2,000,000.00 USD

Technical Assistance

$25,700.00USD from PDAP

Sponsor

City of Lordsburg

ID#

450

The project includes a water treatment system known as activated alumina and the construction of a 1,200 linear feet of eight-inch PVC C-900 water line extension connecting the Smith Well to the Water Treatment Plant (WTP). The project also includes the installation of 3,720 linear feet of ten-inch HDPE sewer line to connect to an existing manhole and dispose of backwash flush water.

    Certification Document

Close Out Report

Close Out Report

The Close‐Out Process provides a review of physical facilities constructed, facility performance and achievement of objectives, as reflected in a results measurement matrix.

    Close Out Report   (PDF, 317 KB)