BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on March 31, 1998

Sector

Water / Wastewater

Location

Del Rio, Texas, USA

Benefited Population

42,000 people

Projected Cost

$44,630,000.00 USD

Sponsor

City of Del Rio

ID#

111

The project includes the construction of a new water treatment plant with a capacity of 51.7 MGD. In addition, the project will replace collection structures and pumping equipment, as well as the existing potable water storage tanks.

    Certification Document