BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project is currently Under Development

Sector

Water / Wastewater

Location

Nuevo Laredo, Tamaulipas, MEX

Projected Cost

$5,500,000.00 USD

Sponsor

BECC

ID#

921

Rehabilitation of the wastewater collection system in the sub-collectors: Coyote Bajo, Coyote Alto, Sur-Poniente, Anahuac Parte Alta (third stage) and Oradel, eliminating direct discharges of wastewater to the stream El Coyote, a tributary of the Rio Grande river.