BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project is currently Under Development

Sector

Water / Wastewater

Location

El Paso, Texas, USA

Projected Cost

$6,950,000.00 USD

Sponsor

BECC

ID#

919

Residents of the Hillcrest Estates and Hillcrest Center do not have access to potable water due to the absence of a distribution system, and wells in this area are not viable. Residents of the area haul water for their domestic usage and for drinking water. This project will extend services to residents that currently do not have water.