The Project will provide the WWC ant treatment infrastructure for the Ejido Nueva Colonia Hindu. The Project includes the installation of approximately 146,000 ft (44,500 m) of pipelines, 5 lift stations and 3,930 ft (1,200 m) of main force line. Additionally, the Project will include a WWTP of 0.28 mgd (12 l/s).