This project is currently Under Development

Sector

Water / Wastewater

Location

G. Diaz Ordaz, Tamaulipas, MEX

Benefited Population

12,354 people

Projected Cost

$8,550,000.00 USD

Sponsor

COMISION MUNICIPAL DE AGUA POTABLE Y ALCANTARILLADO DE CD. GUSTAVO DIAZ ORDAZ, TAM

ID#

817

The proposed project consists of the construction of a wastewater collection system in currently unserved areas, including the installation of yard-line connections from each home to the wastewater collection system and the decommissioning of existing on-site wastewater disposal systems; the rehabilitation of the existing wastewater collection system; the replacement of a lift station; a force main; and the construction of a wastewater treatment plant (WWTP) with a capacity of 26 liters per second (lps) or 0.59 million gallons per day (MGD) (“the Project”).