BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project is currently Under Development

Sector

Water / Wastewater

Location

Vinton, Texas, USA

Benefited Population

1,971 people

Projected Cost

$22,640,000.00 USD

Sponsor

BECC

ID#

891

The Village of Vinton does not have access to centralized wastewater collection system. The proposed project would provide a collection system, one lift station, and a discharge point to El Paso Water’s infrastructure. The project includes decommissioning of septic systems and yard-lines. There are approximately 501 residential connections in this area.