BECC & NADB have merged. For the latest information continue to the NADB Transition Website

English | Español

English | Español

This project was Certified on December 16, 2008

Sector

Water / Wastewater

Location

Sonoyta, Sonora, MEX

Benefited Population

11,278 people

Projected Cost

$2,610,000.00 USD

Technical Assistance

$84,816.00USD from PDAP

Sponsor

O.O.M.A.P.A.S de General Plutarco Elías Calles

ID#

510

The project consist in the construction of “phase 1” of a new lagoon-based wastewater treatment system with a 30 lps (0.685 MGD) capacity and lift station, construction of two wastewater conveyance lines and the expansion of the wastewater collection system (WWCS). This new facility, will replace the existing 16 lps (0.365 MGD) WWTP, which is overloaded and fails to meet effluent quality standards;the new WWTP will be located 2.36 km (1.46 miles) northwest of the current facility and will discharge to Rio Sonoyta, and a later possible use for agriculture irrigation. The wastewater conveyance lines will carry Sonoyta’s wastewater by gravity to the new lagoon treatment system. The expansion of the WWCS will include new service to benefit the following settlements or colonias: Ejido Hombre Blanco, Ejido Pápagos, and Barrio Las Botellas. Approximately 720 new residences will receive first time service.

    Certification Document