The Project consists of the replacement of 5,894 meters of concrete pipe of 76 cm. (30”) in diameter with PVC pipe 76 and 107 cm (30” and 42“) in diameter, and replacement of the associated manholes. In addition, the capacity of the San Antonio de los Buenos WWTP and its compliance with quality standards shall be verified.